Onboard Survey Data Summary

Onboard Survey Data Summary

Document, General Update
This document summarizes the transit onboard survey data obtained by LYNX in July 2017. It describes the dataset used for the analysis, provides basic information about survey respondents, and describes transit travel patterns—including access, egress, and transfer activity. Onboard Survey Data Summary (PDF, 10 MB) Appendix A: Route Summaries (PDF, 2.9 MB) Appendix B: Origin-Destination Matrices (PDF, 1.4 MB)
Read More
Traffic Impact/Access Study

Traffic Impact/Access Study

Document
This page contains links to the Task 6: Traffic Impact/Access Study materials. Traffic Impact/Access Study (PDF, 16 MB) This document is being completed in phases. The current iteration covers the "baseline" traffic conditions (that is, without any transit project).   (NEW) DRAFT §6 (PDF, 2 MB) This DRAFT addition to the Traffic Impact/Access Study covers the expected impacts from the short-listed alternatives (see Identification of Alternatives for more details). A placeholder for §7 outlines the recommendations and mitigations that will be developed once an alternative is selected. Appendices: Appendix A_Level of Services Standards Appendix B_Field-Collected Data Sheets Appendix C_Operations Analysis (NEW) Appendix D_Midblock Crossings (NEW) AppendixE_Hoffner (NEW) Appendix_F_VolumeReassignment (NEW)
Read More
Briefing Document

Briefing Document

Document, General Update
This briefing document summarizes the team's progress in the first six months of the study. It includes key points on the "what, why, and how" of selecting transit alternatives on SR 436.     Briefing Document (11"x17" PDF, 1.4 MB) Briefing Document (8.5"x11" PDF, 1.1 MB)
Read More
Public Involvement Plan

Public Involvement Plan

Document, General Update
The purpose of the Public Involvement Plan is to outline the public involvement strategy for the SR 436 transit corridor study. The plan does this by establishing a framework to solicit meaningful information and insights at key decision-making milestones of the study. Click on the link below to view the draft plan. Task 2.1 Public Involvement Plan (576 KB, PDF)
Read More