This report compiles the results of the SR 436 Transit Corridor Study and includes:
- Findings from the Study,
- Recommendations for limited-stop service and Bus Rapid Transit (BRT) between the Orlando International Airport and the Altamonte Springs SunRail station, and
- Next steps for implementing the recommendations
A high resolution version suitable for printing can be downloaded through this link.